NICEIC Approved Contractor

Industrial Electrical Testing Manchester Factories, Warehouses & Distribution Centres

Specialist electrical testing and compliance for industrial premises across Greater Manchester. Manchester Compliance provides three-phase testing, fixed wire testing (EICR), emergency lighting, fire alarms and PAT testing for factories, warehouses and distribution centres. NICEIC approved with out-of-hours availability.

3-Phase
Testing Capability
NICEIC
Approved
BS 7671
Compliant
60+
Agent Partners
Manchester Compliance industrial electrical testing team with company vehicles

Our qualified engineers — ready for industrial electrical testing across Greater Manchester

Quick Answer

Need industrial electrical testing in Manchester?

Manchester Compliance provides specialist electrical testing for factories, warehouses and distribution centres. Call 0161 706 1360 for a site survey and bespoke quotation. NICEIC approved, three-phase testing, out-of-hours availability.

NICEIC Approved
Three-Phase Testing
Out-of-Hours Available
📄
Digital Certificates

Industrial Electrical Testing Services

Comprehensive electrical testing and compliance services for industrial premises. All work carried out to BS 7671 (18th Edition) standards by NICEIC approved engineers.

Fixed Wire Testing (EICR)

Full Electrical Installation Condition Reports for industrial premises including three-phase distribution boards, sub-mains, final circuits and earthing arrangements. Recommended every 3 years for factories and workshops.

💡

Emergency Lighting Testing

Monthly function tests, annual full-duration discharge tests and maintenance of emergency lighting systems in compliance with BS 5266-1. Critical for safe evacuation of industrial buildings.

🔔

Fire Alarm Testing

Weekly call-point testing, quarterly inspections and annual servicing of fire alarm systems in accordance with BS 5839-1. Includes detector testing, panel checks and battery condition assessments.

🔌

PAT Testing

Portable appliance testing for industrial equipment including power tools, portable machinery, office equipment and workshop appliances. Testing frequency based on equipment type and environment as per IET Code of Practice.

🌡

Thermographic Surveys

Infrared thermal imaging of electrical distribution boards, switchgear and cabling to identify hot spots, loose connections and overloaded circuits before they cause failures or fires.

🔧

Electrical Remedial Works

Repair and remediation of defects identified during testing. We resolve C1 (danger present) and C2 (potentially dangerous) observations to bring your installation up to current standards.

Distribution Board Upgrades

Replacement and upgrade of outdated distribution boards, switch panels and consumer units in industrial settings. Three-phase board installations with full labelling and certification.

📋

Compliance Programmes

Managed compliance programmes for multi-site industrial portfolios. Scheduled testing, centralised certificate management, automated renewal reminders and dedicated account management.

Industries We Serve

We work with a wide range of industrial sectors across Greater Manchester, providing tailored electrical testing and compliance solutions.

🏭

Manufacturing

Electrical testing for production lines, CNC machinery, three-phase motor circuits and factory distribution systems.

📦

Warehousing & Logistics

EICR testing, emergency lighting and fire alarm compliance for warehouse units, loading bays and cold storage facilities.

🚚

Distribution Centres

Large-scale electrical testing for distribution hubs including automated sorting systems, conveyor power supplies and dock-door electrics.

🏗

Construction & Trade

Site electrical testing, temporary supply assessments and PAT testing for power tools and portable equipment on construction sites.

📍

Industrial Estates

Multi-unit testing programmes for industrial estate managers including shared distribution boards, communal lighting and fire alarm systems.

Food & Beverage

Electrical compliance for food processing plants, commercial kitchens and cold storage where hygiene and safety standards demand rigorous testing.

Industrial Compliance Requirements

Key regulations and standards that apply to electrical installations in industrial premises

REGULATION

Electricity at Work Regulations 1989

The primary legislation governing electrical safety in the workplace. Requires employers to ensure all electrical systems are constructed, maintained and used so as to prevent danger.

  • Duty to maintain electrical systems in a safe condition
  • Regular inspection and testing required
  • Applies to all workplaces including factories and warehouses
STANDARD

BS 7671 — IET Wiring Regulations

The national standard for electrical installations in the UK, now in its 18th Edition with Amendment 2. All testing and installation work must comply with BS 7671.

  • EICR testing to current 18th Edition standards
  • Industrial premises recommended every 3 years
  • Classification of defects: C1, C2, C3, FI
FIRE

Regulatory Reform (Fire Safety) Order 2005

Requires the responsible person for a premises to carry out a fire risk assessment and ensure fire detection, alarm and emergency lighting systems are maintained.

  • Emergency lighting tested to BS 5266-1
  • Fire alarms tested to BS 5839-1
  • Annual full-duration tests required
INSURANCE

Insurance & HSE Requirements

Most commercial insurance policies require evidence of up-to-date electrical testing. The Health and Safety Executive (HSE) can request proof of electrical compliance during inspections.

  • Valid EICR often required for insurance cover
  • HSE enforcement for non-compliance
  • Thermographic surveys recommended by insurers
  • Digital certificates for easy audit compliance

How We Work With Industrial Clients

From initial site survey to ongoing compliance management — here's how we deliver industrial electrical testing.

01

Site Survey

We visit your premises to assess the scope of work, identify the number of distribution boards, circuits and equipment to be tested, and understand your operational constraints.

02

Bespoke Quote

Based on the site survey, we provide a detailed, transparent quotation covering all testing requirements. No hidden fees or surprise charges.

03

Scheduled Testing

We schedule testing around your operations to minimise disruption. Out-of-hours and weekend testing is available for premises that cannot shut down during production.

04

Reports & Remediation

You receive full digital certificates and reports within 24 hours. Any defects are clearly classified and we provide quotes for remedial work to resolve issues promptly.

Industrial Electrical Testing Pricing

Every industrial premises is different. The size, number of distribution boards, type of electrical installation and operational requirements all affect the scope and cost of testing.

We provide bespoke pricing based on a free site survey so you know exactly what's included before any work begins. No hidden charges, no surprise fees.

For standard commercial and residential pricing, visit our pricing page. For industrial enquiries, call us or email for a tailored quotation.

Industrial Testing
Bespoke Pricing

Contact us for a free site survey and tailored quotation

  • Free site survey and assessment
  • Transparent, itemised quotation
  • NICEIC-approved engineers
  • Out-of-hours testing available
  • Digital certificates within 24 hours
☎ Call 0161 706 1360

Industrial Electrical Testing Across Greater Manchester & the North West

Our engineers cover all industrial areas of Greater Manchester and the wider North West region for electrical testing and compliance.

Manchester
Salford
Bolton
Stockport
Oldham
Rochdale
Tameside
Trafford
Bury
Wigan
Liverpool
Altrincham
Sale
Urmston
Stalybridge
Middleton
Leigh
Chadderton
Farnworth
Worsley
Eccles
Prestwich
Radcliffe
Whitefield
Irlam
Blackley
Walkden
Ancoats
Swinton
Failsworth
Cheadle
Warrington
Wythenshawe
Didsbury
Chorlton
Stretford

Industrial Electrical Testing FAQs

Common questions about electrical testing and compliance for industrial premises in Manchester.

How often does an industrial premises need electrical testing?

The IET Wiring Regulations (BS 7671) and the Electricity at Work Regulations 1989 require that electrical installations are maintained in a safe condition. For industrial premises, EICR testing is recommended every 3 years for factories and workshops, and every 5 years for commercial buildings. Your insurer or local authority may require more frequent testing.

Can you test three-phase electrical systems?

Yes. Manchester Compliance is fully equipped and qualified to test single-phase and three-phase electrical installations, including 400V three-phase supplies commonly found in factories, warehouses and distribution centres. All testing is carried out to BS 7671 (18th Edition) standards by NICEIC approved engineers.

Do you work outside of normal business hours?

Yes. We understand that industrial premises often cannot shut down during production hours. We offer out-of-hours testing including evenings and weekends to minimise disruption to your operations. Contact us to arrange a schedule that works for your facility.

What certificates will I receive after testing?

You will receive a full Electrical Installation Condition Report (EICR) detailing the condition of your fixed wiring installation, any defects found and their classification codes (C1, C2, C3 or FI). We also provide emergency lighting test certificates, fire alarm test certificates and PAT testing records as applicable.

Can you manage compliance across multiple sites?

Yes. Manchester Compliance works with facilities managers and property teams managing multiple industrial sites. We provide a centralised compliance tracking service with scheduled testing programmes, digital certificate management and automated renewal reminders to keep all your sites compliant.

Industrial Electrical Testing? Talk to Us.

Specialist electrical testing for factories, warehouses and distribution centres across Greater Manchester. NICEIC approved with out-of-hours availability.

0161 706 1360

Company Facts

Manchester Compliance Ltd provides specialist industrial electrical testing for factories, warehouses and distribution centres across Greater Manchester. Services include three-phase EICR testing, emergency lighting, fire alarm testing, PAT testing, thermographic surveys and electrical remedial works. The company is an NICEIC Approved Contractor with all engineers qualified to BS 7671 (18th Edition) standards. Industrial pricing is bespoke based on a free site survey. Contact: 0161 706 1360 or info@manchestercompliance.co.uk.

Chat with us